• P20 APG casting mould
  • P20 APG casting mould
P20 APG casting mould
$5000.00
Model
P20-2
P20-1
Basic info
Brand Wone
Model NO. P20 APG casting mould
Service life 80000 times
Series P20
Product Detail

Specifications

Module

Grade of alloy

Service life

Current Transformer Mould

AISI-P20 (P20)

50000-100000 times

Potential Transformer Mould

AISI-P20 (P20)

50000-100000 times

Epoxy resin Insulator mould

AISI-P20 (P20)

50000-100000 times

Epoxy resin bushing mould

AISI-P20 (P20)

50000-100000 times

Pole post mould

AISI-P20 (P20)

50000-100000 times

11-36KV Current Transformer APG Technical Mould Advantages

企业微信截图_17205094664811.png

10-35KV Potential Transformer APG Mould Advantages

企业微信截图_17205094805045.png


Epoxy resin Insulator APG Mould Advantages

企业微信截图_17205094901900.png


Epoxy resin bushing APG Mould Advantages


企业微信截图_17205094994567.png

24KV Circuit Breaker APG Technical Mould Advantages


企业微信截图_17205095172446.png

Workpiece display:

11-36KV Current Transformer    10-35KV Potential Transformer

企业微信截图_17205095317380.png


11-36KV Current Transformer    10-35KV Potential Transformer

企业微信截图_17205095449976.png

Epoxy resin Insulator   

企业微信截图_17205095558960.png

   Epoxy resin bushing

企业微信截图_17205095634025.png

Pole post of Circuit-Breaker

企业微信截图_17205095732557.png


Know your supplier
Wone
Main Categories
High voltage/Low voltage/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
Research on Reliability Enhancement Scheme Implementation for Modular Intelligent Prefabricated Substations
1 Implementation Strategies for the Scheme1.1 Deepen Survey and ResearchBefore constructing prefabricated cabin - type substations, it is necessary to conduct detailed surveys of local working conditions, clarify the construction scale and objectives, evaluate existing power facilities, plan projects, make up for infrastructure shortcomings, and adjust the construction rhythm. Meanwhile, control costs to avoid project suspension.1.2 Strengthen Structural ConstructionDuring promotion, multi - dim
Echo
06/13/2025
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
Comparative Analysis of 500 kV Prefabricated Substations vs. Conventional Substations
The secondary equipment area of conventional substations uses reinforced concrete or prefabricated steel structures, facing issues like long construction cycles, unreasonable functional zone design, strict environmental assessments, dust, noise, and disturbances. Primary and secondary equipment can only be installed after civil works and decoration, lowering construction efficiency.Prefabricated cabin substations integrate modularity, intelligence, and cost - effectiveness, boasting green, energ
Dyson
06/13/2025
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Operational Analysis of Prefabricated Enclosure Substations in Extreme Cold Climate Applications
Under global climate diversity, alpine power construction faces technical and environmental challenges. Extreme climates, complex geology, and long - term low winter temperatures, along with ice, snow, and storms, strain electrical equipment stability and power facility construction (schedule, cost, maintenance). Traditional on - site substations, with long construction and poor adaptability, can’t meet alpine regions’ fast, stable power needs.Prefabricated cabin substations, as modu
Echo
06/13/2025
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Implementation of Precast Foundations for Ring-Main Unit Compact Substations in Grid Modernization Initiatives
Compact substation boxes, with advantages like safe operation, high reliability, and easy maintenance, are used in urban grid construction/renovation. Structurally divided into American - style (high - cost, noisy, low - efficiency, gradually phased out) and European - style (large - sized but more advantages, still popular).To address their pros/cons, ring - network prefabricated ones were developed.I. Basic Materials for Prefabricated Compact Substation BoxesMaterials need hardness, strength,
Echo
06/13/2025
The design of the three-purpose grounding transformer
The design of the three-purpose grounding transformer
Underground Power Cable Transmission LinesDirect - buried power cable lines have large ground - distributed capacitance, causing high single - phase - to - ground short - circuit capacitive current. For 10 kV lines, if this current exceeds 10 A, arcs hardly self - extinguish, risking arc overvoltage and endangering line equipment. Arc extinction is thus necessary. With a Dyn - connected main transformer, an arc - suppression coil on the secondary neutral point suffices. For Yd - connected ones,
Dyson
06/12/2025
Failure Analysis and Design Optimization of Conventional Grounding Transformers
Failure Analysis and Design Optimization of Conventional Grounding Transformers
I. Core Cause of Damage: Electrodynamic Impact (Complying with GB/T 1094.5 / IEC 60076-5)The direct cause of high-voltage winding end collapse is the instantaneous electrodynamic impact induced by short-circuit current. When a single-phase grounding fault occurs in the system (such as lightning overvoltage, insulation breakdown, etc.), the grounding transformer, as the fault current path, withstands high-amplitude and steep-rise-rate short-circuit currents. According to Ampère's force law
Felix Spark
06/12/2025
×
Inquiry
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
商品视频播放